About the projectWebsite max-energo63. ru is an information resource of the MAKS-ENERGO electrical laboratory. The project positions itself as a security tool, and not just as a service f...
Website max-energo63. ru is an information resource of the MAKS-ENERGO electrical laboratory. The project positions itself as a security tool, and not just as a service for issuing paper protocols. The main idea that the resource conveys is that the electrical system of an object is a living organism that requires regular diagnostics and treatment in case of failures.
The laboratory's activities are focused on measurements and tests in Togliatti, Samara and the Samara region. The company emphasizes that their work is directly related to the prevention of fires, electric shocks and short circuits. Mistakes are unacceptable here, since the lives of people under the responsibility of the customer depend on them.
The electrical laboratory performs a wide range of work for objects up to 1000 V and above. The list of services on the website is detailed and covers both routine checks and troubleshooting:
The result of the work is a technical report. This document is necessary for submission to inspectors of Rostechnadzor, State Fire Supervision and Housing Inspectorate. Insurance companies may also require records when reviewing cases of damage caused by faulty wiring.
The resource is distinguished by a pragmatic approach to the presentation of information. There are no pretentious statements about innovation here; the emphasis is on legal and technical responsibility. Administrative liability is mentioned under Art. 9. 11 Code of Administrative Offenses of the Russian Federation, which emphasizes the seriousness of the requirements for electrical installations.
The site also serves as customer support in case of domestic problems: if the machine breaks down or there are faults in the home wiring, specialists are ready to go to the site. This brings the work of the laboratory closer to medical diagnostics - searching for the cause of a failure and eliminating it.
An important detail is the presence of a certificate of registration of the electrical laboratory, which confirms the legitimacy of the activity.To communicate with the audience, social networks are used with the hashtags electrolaboratorySamara, ETL and other thematic tags.
The website contains contacts for communication in two cities:
The company details are also present: INN 6324033737, KPP 632401001, OGRN 1126324014167. The validity period of the rights to the content is indicated as 2012-2026.
The report is necessary for inspectors of Rostekhnadzor, fire supervision and housing inspection. It is also required by insurance companies when dealing with damage due to faulty electrical wiring.
Employees are ready to go to the site, conduct diagnostics, identify the cause of the malfunction and find a way to repair the system, just as doctors treat the human body.
The main activities are concentrated in Tolyatti, Samara and the Samara region, but work in other regions is also mentioned.
Tests of high-voltage cables, cross-linked polyethylene (XPE) cables, location of cable damage, and measurement of insulation resistance are performed.
domain: MAX-ENERGO63.RU
nserver: ns1.ihc.ru.
nserver: ns2.ihc.ru.
state: REGISTERED, DELEGATED, UNVERIFIED
person: Private Person
registrar: RU-CENTER-RU
admin-contact: https://www.nic.ru/whois
created: 2014-04-02T09:36:44Z
paid-till: 2027-04-02T10:36:44Z
free-date: 2027-05-03
source: TCI
Last updated on 2026-03-17T12:23:02Z
User-agent: * Disallow: /cgi-bin Disallow: /*?* Disallow: /wp- Disallow: *?s= Disallow: *&s= Disallow: /search/ Disallow: /author/ Disallow: /users/ Disallow: */trackback Disallow: */feed Disallow: */rss Disallow: */embed Disallow: /xmlrpc.php Disallow: *utm= Disallow: *openstat= Disallow: *?replytocom Allow: */uploads User-agent: GoogleBot Disallow: /cgi-bin Disallow: /*?* Disallow: /wp- Disallow: *?s= Disallow: *&s= Disallow: /search/ Disallow: /author/ Disallow: /users/ Disallow: */trackback Disallow: */feed Disallow: */rss Disallow: */embed Disallow: /xmlrpc.php Disallow: *utm= Disallow: *openstat= Disallow: *?replytocom Allow: */uploads Allow: /*/*.js Allow: /*/*.css Allow: /wp-*.png Allow: /wp-*.jpg Allow: /wp-*.jpeg Allow: /wp-*.gif Allow: /wp-admin/admin-ajax.php User-agent: Yandex Disallow: /cgi-bin Disallow: /*?* Disallow: /wp- Disallow: *?s= Disallow: *&s= Disallow: /search/ Disallow: /author/ Disallow: /users/ Disallow: */trackback Disallow: */feed Disallow: */rss Disallow: */embed Disallow: /xmlrpc.php Disallow: *?replytocom Allow: */uploads Allow: /*/*.js Allow: /*/*.css Allow: /wp-*.png Allow: /wp-*.jpg Allow: /wp-*.jpeg Allow: /wp-*.gif Allow: /wp-admin/admin-ajax.php Clean-param: etext Sitemap: https://max-energo63.ru/sitemap_index.xml
| Position | Phrase | Page | Snippet |
|---|---|---|---|
| 4 | / | ||
| 5 | /ispytanie_diehlektr... | ||
| 6 | /izmerenie_koehffici... | ||
| 7 | /ispytanie_diehlektr... | ||
| 9 | /ispytanie_diehlektr... | ||
| 21 | /izmerenie_soprotivl... | ||
| 21 | /proverka_molniezash... | ||
| 22 | /izmerenie_soprotivl... | ||
| 25 | /izmerenie_soprotivl... | ||
| 26 | /ispytanie_diehlektr... |
| Position | Phrase | Page | Snippet |
|---|---|---|---|
| 3 | /izmerenie_koehffici... | ||
| 6 | /puskonaladochnye_ra... |